integration of low-density stations into joint control tower without using facilities of CTC tower and without installation of linear CTC post.selection of sections for temporary local control (both with arrangement of additional working place and with control from point tower) on the station with shunting works.division of large-scale stations on unlimited number of zones for control (secular and seasonal).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |